
Futuristic, statement-piece people bridge opens near Atlanta’s airport
Futuristic, statement-piece people bridge opens near Atlanta’s airport
Josh Green
Thu, 06/19/2025 – 11:10
The City of College Park now counts a can’t-miss, sculptural piece of people-friendly infrastructure that links two popular destinations and helps keep pedestrians and cyclists out of vehicle traffic.
Spanning 200 feet across four-lane Camp Creek Parkway, the Global Gateway Connector Bridge is now open as a connection between downtown College Park and Georgia International Convention Center—a key part of a broader multi-use trail initiative in the area.
According to project engineers STV, the suspension bridge is punctuated by an 80-foot-tall steel basket-handle arch that required five cranes to lift and install in September.
Other components include dramatic lighting at night, a suspended deck, and custom fence detailing and architectural rails.
The bridge project, situated a few hundred feet from Hartsfield-Jackson Atlanta International Airport, cost $13.7 million, including work on support walls and improvements to nearby multi-use trails, according to STV. (Despite inflation, the cost was still less than half of downtown Atlanta’s controversial serpentine bridge structure deluxe.)
STV officials joined College Park dignitaries in cutting the proverbial ribbon for the Gateway bridge on Tuesday.
The project’s connecting, 1.08-mile trail begins downtown at the intersection of John Wesley Avenue and West Main Street before heading toward the convention center.
Immensity of the bridge structure is shown while under construction in College Park. Courtesy of STV
Where the Gateway trail project terminates in downtown College Park after crossing Camp Creek Parkway. The airport is shown at bottom right. Google Maps
The 10-foot-wide connector pathway was designed to optimize bicyclist and pedestrian safety—a Camp Creek Parkway bypass for people not in cars, basically—while providing access to schools, markets, and medical clinics in the area. It also serves to connect College Park’s downtown MARTA station to the convention center and, in theory, the long-planned Six West development, a massive proposal spanning more than 300 acres that’s been likened to a southside version of Atlantic Station.
The Atlanta Regional Commission covered the cost of more than 80 percent of the Gateway project’s design and construction. The rest was paid for via TSPLOST and College Park’s general fund, project officials previously said.
Josh Stamm, a STV senior engineer, said in a prepared statement the complex design and installation of the Gateway resulted in “both a visual landmark for the City of College Park and a crucial infrastructure upgrade” that now provides a “seamless pedestrian link.”
Projected look of the Global Gateway Connector Bridge in early renderings. Courtesy of STV Incorporated
…
Follow us on social media:
Twitter / Facebook/and now: Instagram
• College Park, East Point news, discussion (Urbanize Atlanta)

Futuristic, statement-piece people bridge opens near Atlanta’s airport
Josh Green
Thu, 06/19/2025 – 11:10
The City of College Park now counts a can’t-miss, sculptural piece of people-friendly infrastructure that links two popular destinations and helps keep pedestrians and cyclists out of vehicle traffic. Spanning 200 feet across four-lane Camp Creek Parkway, the Global Gateway Connector Bridge is now open as a connection between downtown College Park and Georgia International Convention Center—a key part of a broader multi-use trail initiative in the area. According to project engineers STV, the suspension bridge is punctuated by an 80-foot-tall steel basket-handle arch that required five cranes to lift and install in September. Other components include dramatic lighting at night, a suspended deck, and custom fence detailing and architectural rails.
Courtesy of STV
The bridge project, situated a few hundred feet from Hartsfield-Jackson Atlanta International Airport, cost $13.7 million, including work on support walls and improvements to nearby multi-use trails, according to STV. (Despite inflation, the cost was still less than half of downtown Atlanta’s controversial serpentine bridge structure deluxe.) STV officials joined College Park dignitaries in cutting the proverbial ribbon for the Gateway bridge on Tuesday. The project’s connecting, 1.08-mile trail begins downtown at the intersection of John Wesley Avenue and West Main Street before heading toward the convention center.
Immensity of the bridge structure is shown while under construction in College Park. Courtesy of STV
Where the Gateway trail project terminates in downtown College Park after crossing Camp Creek Parkway. The airport is shown at bottom right. Google Maps
The 10-foot-wide connector pathway was designed to optimize bicyclist and pedestrian safety—a Camp Creek Parkway bypass for people not in cars, basically—while providing access to schools, markets, and medical clinics in the area. It also serves to connect College Park’s downtown MARTA station to the convention center and, in theory, the long-planned Six West development, a massive proposal spanning more than 300 acres that’s been likened to a southside version of Atlantic Station. The Atlanta Regional Commission covered the cost of more than 80 percent of the Gateway project’s design and construction. The rest was paid for via TSPLOST and College Park’s general fund, project officials previously said. Josh Stamm, a STV senior engineer, said in a prepared statement the complex design and installation of the Gateway resulted in “both a visual landmark for the City of College Park and a crucial infrastructure upgrade” that now provides a “seamless pedestrian link.”
Courtesy of STV
Projected look of the Global Gateway Connector Bridge in early renderings. Courtesy of STV Incorporated
…Follow us on social media: Twitter / Facebook/and now: Instagram • College Park, East Point news, discussion (Urbanize Atlanta)
Tags
John Wesley Avenue at West Main Street
College Park
Gateway Pedestrian Bridge and Trail Project
Georgia International Convention Center
ATL Skytrain Automated People Mover
STV Incorporated
College Park Gateway
6 West
Alternative Transportation
Atlanta Bike Lanes
Atlanta Multiuse Trails
Pentagon 540
Vanasse Hangen Brustlin
ECS Southeast
Prime Engineering
C.W. Matthews Contracting Co.
Mayor Bianca Motley Broom
Six West
Six West Development
Global Gateway Connector
Global Gateway Connector Bridge
Southside
Atlanta Bridges
Images
Where the Gateway trail project terminates in downtown College Park after crossing Camp Creek Parkway. The airport is shown at bottom right. Google Maps
Courtesy of STV
Immensity of the bridge structure is shown while under construction in College Park. Courtesy of STV
Courtesy of STV
Projected look of the Global Gateway Connector Bridge in early renderings. Courtesy of STV Incorporated
Courtesy of STV Incorporated
Subtitle
200-foot pedestrian, cyclist structure links College Park to Georgia International Convention Center
Neighborhood
College Park/East Point
Background Image
Image
Before/After Images
Sponsored Post
Off Read More